Die Inhalte auf diesen Seiten stammen vom Serviceportal des Landes Baden-Württemberg und werden automatisch synchronisiert. Das Portal bietet die Möglichkeit, sich einen personalisierten Zugang einrichten und persönliche Dokumente sicher abzuspeichern, um sie jederzeit elektronisch verfügbar zu haben.
Apply for funding for charging infrastructure for e-taxis
In Baden-Württemberg, taxis, hire cars, on-demand transport and car-sharing vehicles with high mileages in urban areas are to be converted to electric drives. This will avoid significant local pollutant emissions. The state of Baden-Württemberg also sees e-taxis to a large extent as multipliers for the use of cars with electric drives.
You can finance this:
Funding is provided for the maintenance and charging infrastructure costs for new (first registration) fully electric e-taxis, hire cars, on-demand transport and car-sharing vehicles from the EC-Vehicle classes M1 and N1 (according to § 2 No. 2 and No. 4 EmoG).
The vehicles must have been in operation for at least three years. In the case of leasing, over the entire leasing period (maximum three years). This applies predominantly in Baden-Württemberg in the respective provision district for taxis or hire cars.
Responsible department
Landeskreditbank Baden-Württemberg - development bank
Details
Prerequisite
- Funding is available for legal entities and natural persons based in Baden-Württemberg who can guarantee the construction and operation of charging infrastructure for e-taxis. Private or company charging stations are not eligible for funding. The charging points must be available for public use by e-taxis.
- The minimum technical standards with regard to charging plugs are based on the latest version of the Charging Point Ordinance (LSV).
- Accessibility around the clock (24/7) for e-taxis must be guaranteed.
- Electricity from renewable energy sources must be used.
- The charging infrastructure must be put into operation within 6 months of receipt of the grant notification and must be in operation for at least 6 years from completion at the location in Baden-Württemberg defined in the application.
- Ground markings and signage must be installed at the parking spaces of the subsidised charging infrastructure.
- Parking or charging spaces at the charging station must be designated as taxi-exclusive.
- It is recommended that the charging infrastructure be prepared to support the subsequent implementation of ISO/IEC 15118 (Power Line Communication).
- The remote capability of the charging point must be ensured.
- The maximum charging power of the charging station must be downward compatible.
- Reporting obligations and grid connection conditions of the grid operator must be complied with.
- The charging station must be operated in compliance with measurement and calibration law.
- The charging station must be operated in accordance with the current state of the art in terms of IT security and data protection.
- Findability, usability, easy accessibility (authentication and billing) and price transparency must be guaranteed.
Procedure
You can apply for funding online on the L-Bank website.
Your application will then be reviewed by L-Bank and you will receive notification if it is approved
Deadlines
none
Required documents
The required documents and applications can be found on the homepage of Landesbank Baden-Württemberg.
Costs
none
Miscellaneous
none