Die Inhalte auf diesen Seiten stammen vom Serviceportal des Landes Baden-Württemberg und werden automatisch synchronisiert. Das Portal bietet die Möglichkeit, sich einen personalisierten Zugang einrichten und persönliche Dokumente sicher abzuspeichern, um sie jederzeit elektronisch verfügbar zu haben.

Symbolfoto Einfache Sprache
Barrierefrei ins Amt: Mit dem Wegweiser www.heidelberg.huerdenlos.de finden Sie Hinweise zur barrierefreien Zugänglichkeit der Ämter und Dienststellen der Stadt Heidelberg.
Procedure descriptions

Show building project in the notification procedure

Is your planned project not exempt from procedure and do the requirements for the notification procedure apply? Then you as the client can choose between

  • the notification procedure and
  • the simplified building authorisation procedure.

In the notification procedure, you inform the competent authority about the building project. If no-one has any objections, you can start work after a deadline has expired.

The procedure makes sense if the building project complies with the provisions of the development plan and the other building regulations, in particular the state building regulations, are also complied with. Deviations, exceptions or exemptions, for example from spacing regulations, are not possible. It is also quick and inexpensive.

The author of the design is responsible for ensuring that his design complies with public law regulations. The client is responsible for ensuring that the building authority receives the necessary information and documents. The construction work may not deviate from the designs submitted for approval. As a rule, you can begin construction one month after the municipality has received the complete building documents.

If another decision is required for a project in the notification procedure, such as a permit under the Monument Protection Act, you as the building owner must apply for this decision in addition to the notification.

The Digital Monument Map of Baden-Württemberg, which is available on the Geoportal BW, can be used to determine whether monument protection issues need to be taken into account in the area of a building project. Select the "Cultural monuments" map there and navigate to your building site using the "Search for addresses, locations, data". If cultural monuments are listed there, the project may require authorisation under monument law. Further information can be obtained from the relevant Lower Monument Protection Authority.

A notification procedure is also possible,

  • if you want to change facilities that require notification or change their use and
  • the project is still subject to notification even after the change.

The same applies to the demolition of all installations if they are not already exempt from the procedure.

Forms/Online Services

Responsible authority

the lower building authority

Depending on the location of the building project, the lower building authority is

  • the municipal/city administration or
  • the district office.

Details

Prerequisite

  • Your building project is not exempt from procedure.
  • The building project lies within the scope of a development plan that contains at least the following stipulations
    • the type (e.g. residential, commercial) and
    • the extent (size) of the building utilisation,
    • the areas of land that can be built on and
    • the local traffic areas.
  • The project must not contradict the provisions of the development plan.
  • It is one of the following building projects:
    • a residential building
    • a detached building with a height of up to 7 metres and no more than two units of use totalling no more than 400 square metres (building class 1 according to the state building regulations), excluding restaurants
    • a detached building used for agriculture or forestry (building class 1 according to the state building regulations),
    • a building with a height of up to 7 metres and no more than two units of use totalling no more than 400 square metres (building class 2 according to the state building regulations), excluding restaurants,
    • one other building with a height of up to 7 metres (building class 3 according to the state building regulations), excluding restaurants,
    • other structures that are not buildings
    • an outbuilding and ancillary facilities for the above-mentioned projects, such as garages
  • This is not a special building.

Procedure

The required building documents and the completed survey form for the statistics on construction activity are submitted electronically by the building owner to the responsible building authority via the online service provided (usually ViBa-BW):

  • The building law authority checks within five working days whether the building documents are complete, whether the development of the project is secured, whether there is an obstructing building encumbrance and whether the project is within the scope of a development statute, a conservation statute or a redevelopment area.
  • If this does not result in any restrictions under building law, the building authority will notify the date of complete receipt.
  • Otherwise, it will inform the building owner and, if applicable, the municipality of the existing restrictions that need to be rectified.

Prior to the start of construction, the building owner is responsible for having the structural engineering certificates checked by an expert, for having the floor plan and height of buildings on the building plot determined by an expert and for submitting technical information on combustion systems and stationary combined heat and power plants and combustion engines in buildings to the authorised district chimney sweep.

Deadlines

If all adjoining owners and other neighbours have given their written consent, you may begin construction two weeks after the building authority has received the complete building documents.

Otherwise, you may generally begin construction one month after receipt of the complete building documents by the building authority.

Required documents

  • Site plan
  • Construction drawings
  • Building description
  • Representation of the site drainage
  • Declaration on the proof of stability
  • Confirmations from the author of the design and the preparer of the site plan
  • Confirmation from the client that he has assumed responsibility for the project
  • Name and address of the client and the site manager, if one has been appointed

The documents must be submitted in archivable Portable Document Format (pdf/A) via the transmission channel specified by the building authority.

Costs

The competent authority may charge a fee for the confirmation of receipt. You must also pay for the decision on a deviation, exception or exemption from public law regulations.

Miscellaneous

none

Legal basis

Landesbauordnung (LBO):

  • § 42 Pflichten des Bauherrn
  • § 43 Entwurfsverfasser
  • § 51 Kenntnisgabeverfahren
  • § 53 Bauvorlagen und Bauantrag

Verordnung der Landesregierung, des Ministeriums für Landesentwicklung und Wohnen über das baurechtliche Verfahen (Verfahrensverordnung zur Landesbauordnung - LBOVVO):

  • § 1 Bauvorlagen im Kenntnisgabeverfahren

Release note

Machine generated, based on the German release by: Ministerium für Landesentwicklung und Wohnen Baden-Württemberg, 14.11.2025

Info

Hallo liebe Nutzerin, hallo lieber Nutzer. Ich bin Lumi. Ich helfe dir gerne bei Fragen rund um unsere schöne Stadt Heidelberg weiter.

Ich bin eine sogenannte generative künstliche Intelligenz und arbeite mit einer Technologie namens ‚Large Language Model', kurz (LLM). Das bedeutet, dass ich auf der Grundlage einer Vielzahl von Daten und Informationen vortrainiert wurde und Antworten generieren kann.

Trotzdem kann es passieren, dass meine Antworten manchmal fehlerhaft und nicht perfekt sind. Das kann die folgenden Gründe als Ursache haben:

  1. Technische Limitierung: Obwohl ich eine neuartige Technologie bin, kann ich nicht immer die beste Antwort geben, weshalb ich auch noch regelmäßig optimiert werde.
  2. Kontextverständnis: Für eine gute und passende Antwort greife ich für mein Verständnis Ihrer Frage auf vorhandene Daten und ein Sprachmodell (LLM) zurück. Unsere Sprache ist komplex und vielschichtig, weshalb ich nicht immer den Kontext einer Frage richtig interpretiere.
  3. Aktualität: Ich bin als textgenerierendes System sehr gesprächig, aber manchmal fehlen mir tagesaktuelle Daten oder Informationen z.B. zu den neuesten Pressemitteilungen.
  4. Halluzination durch Informationslücke: Es kann vorkommen, dass ich Antworten generiere, die erfunden oder ‚halluziniert' sind. Das liegt daran, dass ich auf Basis von Wahrscheinlichkeiten eine Antwort ausgebe und nicht immer über die aktuellen und passendsten Informationen für Ihre Frage verfüge.

Falls du mit einer Antwort von mir unzufrieden bist, dann klicke bitte oben im Chat-Bildschirm auf das Reset-Symbol (↺) und formuliere deine Frage gerne anders.

Du kannst auch aktiv an meiner Verbesserung mithelfen und dich bei Fragen, Unklarheiten oder Verbesserungsvorschlägen zu Lumi direkt an digitales@heidelberg.de wenden.

Die Privatsphäre und der Schutz personenbezogener Daten sind für uns ausgesprochen wichtig. Für die Beantwortung werden keine personenbezogenen Daten benötigt. Bitte gebe deswegen auch keine sensiblen oder personenbezogenen Daten in den Chat ein.

Solltest du uns diese dennoch im Chatverlauf mitgeben, werden wir sämtliche Informationen vertraulich behandeln. Bitte beachte deshalb die Datenschutzhinweise und beachte bitte zudem die allgemeinen Datenschutzhinweise für die Nutzung der Webseiten der Stadt Heidelberg unter folgendem Link: Datenschutz.

Lumi wird kontinuierlich weiterentwickelt

×